Any mention of change or the theory of it typically draws comments about change management and the use of models such as Kotter or Lewin. This post is NOT about that and instead introduces the idea of a personal theory of change, which in real life presents itself as why and how you think a change will happen. Much of the following information and inspiration has come from the Centre for Theory of Change

What?

A theory of change (TOC) is essentially a comprehensive description and /or illustration of how and why a desired change is expected to happen. It focuses particularly on describing what a program or change initiative does (its activities or interventions) and how these lead to desired goals being achieved. Theories of change are often in the form of a descriptive text paragraph(s) and/or a visual diagram. A typical conversation focusing on TOC may sound like…

(Staff Member 1) “I want to improve A and so I think we need to do B &C”,

(Staff Member 2) ” That sounds exciting what’s your theory of change?

Why?

The process of creating a theory of change is as beneficial as the product itself. The design process enables the creator to:

  • Locate the different stages of the change process.

  • Ensure that they logically fit and flow together.

  • Highlight possible roadblocks.

  • Anticipate what support will be required.

  • Identify key evaluation milestones.

The end product also provides a wide range of benefits by creating:

  • A clear and testable hypothesis about how change will occur.

  • A visual representation of the change how it is expected to come about.

  • A blueprint for evaluation with measurable indicators of success.

  • An agreement among stakeholders about what defines success and what it takes to get there.

  • A powerful communication tool to capture the complexity of an initiative.

How?

Like most organisational processes that are being used and updated over time, there is no singular agreement on the process of creating a TOC nor how it should be presented. What we do have however is some guidance from the literature and organisational experience which can help. What follows is a synthesis of that information.

Stage 1: Outcomes & Pathways

The first step is to identify the outcomes of the change process starting with the end result and working backward through the intermediate stages. These are sometimes called results or outputs but essentially ask the question; what are you trying to achieve and what are the steps in getting there?

Outcomes should be well defined, measurable and plausible.

The next step in this stage is to draw the links between the outcomes, highlighting the casual or impact pathways. These will not always create a linear image as some outcomes will create multiple pathways to multiple outcomes. It is also important to critically reflect on the evidence linking two outcomes. How likely is it that A will lead to B?

The final step in this stage is to take a step back and ensure that the outcomes are in the right order, that none are missing and that the pathways create the correct links.

Stage 2: Interventions

The next stage in the process is to identify the interventions that will be put in place to successfully link outcomes together. These are also called activities and essentially ask the question; what is going to happen in order to move the change from A to B to C etc.

Interventions should be realistic, credible and sustainable.

It is important to recognise that outcomes may require multiple interventions.

Stage 3: Assumptions

Stage three of the TOC design is often the most overlooked during conversations about change. This stage requires the creator to reflect on what assumptions they have made between outcomes and attached to interventions. A common set of assumptions within professional development would be that the creation of an event will ensure attendance (assumption) and that attendees will engage (assumption) and finally that learners will apply their new knowledge and skills after training (assumption).

This stage essentially tries to seek out what might hinder movement between TOC outcomes.

Stage 4: Responses

The final stage is to identify the set of possible responses that you could use to address each assumption and increase the likelihood of A leading to B. Using the previous example, how can you encourage attendance at the event? Will more relevant content increase engagement? Would recognition and praise mean staff apply their learning more?

As with interventions, responses need to be realistic, credible and sustainable.

Stage 5: Coherence

Stage five is another chance to step back at look at the overall coherence of the TOC.

Are all of the elements present and in the right place?

Are the causal links right?

Have all of the assumptions be identified?

Have responses been thoroughly explored?

Theory of Change Analysis (TOCA)

The process of evaluating a theory of change is often called ‘Theory of Change Analysis’ or TOCA. This can happen prior to a change process being started as part of the planning process or after the launch as part of the overall evaluation process.

Maine (2017) suggests the following set of questions for TOCA sessions. They focus on the structure of the theory and its plausibility.

Structurally sound:

  1. Is the ToC understandable? Are there pathways of results, and are causal
    link assumptions set out?

  2. Are the ToC results and assumptions well defined?

  3. Is the timing sequence of results and assumptions plausible?

  4. Is the ToC logically coherent? Do the results follow a logical sequence?

  5. Are the causal link assumptions necessary or likely necessary?

  6. Are the assumptions independent of each other (recognizing that some
    assumptions may apply for more than one causal link)?

Plausible:

  1. Is the ToC generally agreed by stakeholders?

  2. Are the results and assumptions measurable? What is the likely strength or status of evidence?

  3. Are the causal link assumptions likely to be realized? Are at-risk assumptions mitigated through confirming or corrective actions?

  4. Are the sets of assumptions for each causal link along with the prior causal factor plausibly sufficient to bring about the effect?

  5. Is the level of effort (activities and outputs) commensurate with the expected results?

  6. To what extent are the assumptions sustainable?

Key Takeaways

  • Theory of change is not the same as change management theory.

  • Theories of change are specific to change initiatives.

  • Each change initiative will have a different theory of change.

  • The process of TOC creation is just as useful as the product

  • Theories of change can support the planning and evaluation stages of an initiative